PSIpenta/MES Agile MES for discrete production

Receive real-time information from your production and optimize your planning and production control.

With PSIpenta/MES you receive real-time information about your discrete production and optimize your planning and production control. Our software solution is one of the leading systems for medium-sized manufacturing companies.

Planning and controlling production as well as quality, resources and material management: Use PSIpenta/MES to create effective production plans by aligning material, personnel and machine resources. This means you can optimize your system utilization and at the same time reduce your material inventories to a minimum.

Benefits at a glance

PSIpenta/MES
  • Optimized planning and production control Reduce your costs and increase output during ongoing operations.
  • Efficient workflows can be individually adapted Adapt your processes to your needs, simply by drag & drop.
  • Monitoring of all relevant processes Reduce downtimes in production and at the same time reduce inventory in the warehouse.

Functions

  • Material management With PSIpenta/MES you can always track where the material is in your production. Whether raw materials, intermediate products or even finished products: the material consumption and the manufactured products are tracked in terms of quantity. This information can trigger further activities if necessary, such as: B. Storage or removal from storage.
  • Workflow design With PSIpenta/MES you no longer have to laboriously program processes. Processes are easily modeled, tested and changed step by step using workflows. The modeling is done in easy-to-understand graphical tools.
  • Detailed planning Reliable statements about deliveries and production dates: PSIpenta/MES helps you plan ahead and identify impending bottlenecks. Do you use an ERP system other than PSIpenta/ERP? No problem. With our PSIpenta/MES Order Management, you can easily operate PSIpenta/MES underneath your ERP system.

Modules

Scheduling
Module

Scheduling

PSIpenta/MES Scheduling allows you to plan sequences per work center and thus define specific processing sequences. The software takes into account the available capacities and thus plans against finite capacities.

Details of this module
Order management
Module

Order management

ERP extension for your shop floor: The order management module of PSIpenta/MES forms the bridge between the standard business software systems and the implementation level in production.

Details of this module
Sequencing
Module

Sequencing

The sequencing module enables intelligent, balanced detailed planning for line production. The module helps companies to structure production orders efficiently, avoid bottlenecks, and ensure consistent capacity utilization.

Details of this module

Typical users

iStock.com/gorodenkoff

User

A trouble-free and at the same time efficient production process is the be-all and end-all for the classic MES user. Intuitive access to all relevant functions is just as important to him as the certainty that all entries and requests are processed reliably by the system.

  • Performance data

    With valid figures, PSIpenta/MES supports production management in monitoring ongoing operations and discovering optimization potential.

  • Handling

    In everyday work, software users not only need a stable system landscape, but also an easy-to-use one that leaves no questions unanswered when it comes to handling.

  • Reliability

    A trouble-free system that works without compromises - on all levels: The typical user wants to be able to concentrate on their actual tasks without distraction.

Case Studies

GHH Fahrzeuge GmbH

Case Study GHH Fahrzeuge increases data and process quality with PSIpenta

Thanks to PSI's ERP and MES solution: mapping of growing parts lists and data acquisition at the same time as the physical process.

Questions and answers

Which tasks are processed using an MES?

A Manufacturing Execution System (MES) is software that optimizes the manufacturing process by monitoring, tracking, documenting and controlling the entire production lifecycle. Implementing an MES improves quality control and increases productive time while reducing inventory and costs. A significant advantage of such a production control system is improved product tracking and genealogy, which is particularly important for manufacturers who have to comply with legal regulations and transparency requirements.

Can MES and ERP be sensibly linked together?

In PSI's software portfolio, PSIpenta/MES and PSIpenta/ERP form an integral ecosystem that functions smoothly at all levels. Together, both systems provide a holistic view of finance, procurement, supply chain management, manufacturing logistics and more. When working together, the systems offer optimized control in all areas of production. Via PSIpenta/MES Order Management it is also possible to run PSIpenta/MES underneath ERP systems that do not come from PSI.

Which other solutions from PSI can be combined with the MES?

PSI Software SE complements its portfolio with integrated solutions for the entire value chain, from logistics to manufacturing to after-sales service. In addition to the MES and the ERP solution, there are software offerings for e.g. B. AI, WMS and SCADA.

How reliably does communication with hardware and third-party systems work?

PSIpenta/MES is designed to be connective from the ground up: The interfaces for hardware and other systems use common technical standards and enable coupling with all common systems, machines and systems.

Talk to one of our experts

Get in touch Do you need further information?