Depot and charging management system ensures successful operation of e-buses for six months

Berlin, 10 March 2020 – The depot and charging management system PSIebus successfully controls the new e-bus fleet at the Alsterdorf depot of Hamburger Hochbahn AG (HOCHBAHN). The system has been in operation for about six months and charges the buses with a daily charging capacity of around five megawatts. It sends them charged, cleaned, serviced and pre-conditioned on the blocks that match their remaining range. In the medium term, the first bus depot in Germany designed entirely for e-mobility will have the necessary charging technology and power supply for 240 buses.

Until full e-bus operation, PSIebus ensures in parallel operation with diesel and electric buses that all vehicles start their trip on time and arrive safely back at the depot. The vehicles are dispatched within seconds, with the use of e-buses being prioritized higher.

An integrated load management controls the entire energy requirement of the depot and monitors and controls the individual chargers. The system is optimized so that the vehicles are reliably ready for operation at the beginning of the shift and HOCHBAHN can obtain the energy required for the electric buses. PSIebus avoids unnecessarily high peak loads. This saves costs in the expansion of the power grid and guarantees stable public transport operations.

HOCHBAHN is the second largest public transport company in Germany with four underground lines, 250 underground vehicles, 110 bus lines, almost 1000 buses and around 1.2 million passengers every day.

PSI offers transport companies a unique AI-based system for the efficient monitoring and control of alternatively powered bus fleets. In addition to HOCHBAHN, the French Keolis S.A. relies on PSIebus for e-bus operations in Vélizy near Paris.

Based on its own software products, PSI Group develops and integrates complete solutions for optimizing the flow of energy and materials for utilities (energy networks, energy trading, public transport) and industry (mining, metals production, automotive, mechanical engineering, logistics). PSI was founded in 1969 and employs 2,000 persons worldwide. 

Press Contact

Related press releases

Press Release PSI receives final acceptance of the SASO subproject from E.ON as part of the eBase project

PSI Software SE has received final acceptance of the SASO subproject from four E.ON grid companies as part of the eBase project. Based on PSIaso/DSO, Avacon Netz GmbH, Bayernwerk Netz GmbH, E.DIS Netz GmbH, and Schleswig-Holstein Netz GmbH will use the software solution in operations for predictive grid state forecasting.

AI-generated

Press Release PSI to showcase AI-based software solutions for gas network operations at GASTECH Bangkok 2026

PSI Software SE will present its software solutions for the efficient monitoring and control of gas transport and distribution networks at GASTECH 2026, booth E122, taking place from September 14th to 17th, 2026, in Bangkok, Thailand. The presentation will focus on optimized processes, simulation, the safe transport of natural gas, and AI-based…

Press Release PSI completes important milestone in the Kopernikus ENSURE project

PSI Software SE has successfully completed its tasks in the third phase of the groundbreaking Kopernikus ENSURE project. Funded by the Federal Ministry of Research, Technology, and Space, the project aims to test modular and flexible approaches for future-proof network structures in hybrid real-world operations. In its assigned component, PSI…